Off-Grid Process

SPS Solar + Water

Off-Grid Process

To achieve a great outcome, you need a great process to ensure you have a seamless install and connection of your Off-Grid system.

Our remote solar projects always begin with a site assessment. Once we understand your budget, current and future load profile as well as the aspect at your site, we can design the perfect solution for your off-grid installation.

Off-grid projects can start as small as a couple of lights in a shed, or be as large as a family home with high loads or be an irrigation pump required to run 24 hours (see solar pumping). Whatever the size, we are able to design a site specific solution.

072A5337 Edit 1 1536x1152 2
SPS HI RES 0053
Norm Smith Wellington

Our typical off-grid project lifecycle will include the following 4 steps below

Screenshot 2024 04 19 032649 removebg preview

SITE INSPECTION & LOAD PROFILE

Our expert team carefully check your power & site, including meter box, cable sizes, roof space and power bills to ensure the we can fit the right size system to generate the best savings and return for your installation. We also analyse where the power is being consumed in your home in combination with your household habits and come up with a Load Profile.

Screenshot 2024 04 19 032723 removebg preview

PROPOSAL & APPROVAL

According to your site inspection and load profile, a recommendation is presented to you, your questions answered and approval completed. Your deposit will allow us to block your project into our schedule and order components in readiness for your installation.

Screenshot 2024 04 19 032734 removebg preview

SYSTEM INSTALLATION

Connection approval is usually received within 7-14 days after which, we approve the schedule for your installation with you. Most domestic systems are installed in 1-2 days.

Screenshot 2024 04 19 032747 removebg preview

SYSTEM RUN-THROUGH AND HANDBOOK

Your project manager will run through your new solar installation with you either in person or over the phone at a time suitable to you within approximately two weeks from your installation. Your Solar System Handbook will be emailed to you containing safety information, compliance, warranty and components specification documentation.