OZ Choppers
James Manners
PROJECT: COMMERCIAL
LOCATION: MUDGEE
CONNECTION: ON-GRID
ARRAY SIZE: 30KW
AVG. DAILY PRODUCTION: 145KW
SPS conducted a comprehensive assessment of OC consumption over a 14 day period prior to presenting a solution to Oz Choppers.
The final project consisted of 2 x 15 kW grid connected solar systems on workshop roof area, to ensure compatibility with two 3 phase metering points within the main workshop and spray booth shed. 120 PV modules coupled with 2 x SMA STP 15kW 3 phase inverters.
This installation provides an average daily power production of 146 kWh.
Kate Rogers said:
“From when we first contacted them, SPS Solar were very professional, Steve came and saw us, gave us a very detailed explanation of what he would do starting with the [site analysis] datalogging. After processing, he supplied a spreadsheet with clear costs and analysis, how long it would take and what the process would be. We were very well informed all the way along and it was all done very professionally.”